Latest News

Read about the latest news at Hi-Spec Systems, read blog posts and watch equipment demonstrations and videos.

UltraPhase On-Site Pipeline Inspection

April 15, 2019

 

 UltraPhase on-site pipeline inspection.
Pipeline weld size: radius - 1016 mm ; thickness - 21mm
April 2019, Yueyang, China


 

 

Please reload

  • YouTube Social  Icon
  • LinkedIn Social Icon
  • Facebook Social Icon
  • Twitter Social Icon

© Hi-Spec Systems 2019